Domestic
▶ Professor. Kyung-rai Kim
Yoon, J. S., Kim, K. R., Jung, D. W., Yu, I. H. (2019). "Analysis of Construction Policy System for Quality Assurance of Construction Used Steels" Korean Journal of Construction Engineering and Management, KICEM, 20(1), 3-13.
Nam, S. H., Kim, K. R., Park H. G. (2019). "A Study on Development of Owner's Standard Specification Structure for Modular Building" Korean Journal of Construction Engineering and Management, KICEM, 20(3), 12-21.
Cho, B. H., Lee, D. Y., Nam, S. H., Lee, J. S., Jung, D. I., Kim, K. R. (2019). "Factory Production Management of Modular Units Using MFD 2019" Journal of the Architectural Institute of Korea Structure & Construction, 35(6), 139-146.
Kim, K. R., Yoon, Y. H., Shin, S. K., Park, S. S., Lee, D. H. (2018). "A Study on Old Multi-Family Residential Remodeling Project's Scope and Process Based on Business Models" Journal of the Korean housing association, 29(6), 35-45.
Nam, S. H., Kim, K. R. (2017). "The Study on the Project Delivery System for Vitalizing the Green Remodeling" Korean Journal of Construction Engineering and Management, KICEM, 18(2), 3-11.
Yoon, J. S., Kim, K. R., Shin, D. W., Cha, H. S. (2017). "A Study on Improvement of Modular Specifications - Focused on technical specifying method in waterproof and mechanical works -" Korean Journal of Construction Engineering and Management, KICEM, 18(3), 33-41.
Kim, K. R., Shin, S. K., Yoon, Y. H., Lee, D. H. (2017). "A Study on the Component and Type of Old Multi-Family Residential Improvement Projects" Journal of the Korean Association For Housing Policy Studies, 25(3), 25-45.
Bae, B. Y., Kim, K. R., Shin, D. W., Cha, H. S. (2017). "Analysis Methodology for Feasibility Study of Remodeling of Aged Apartment by Comparative Analysis of Price Influencing Factors" Korean Journal of Construction Engineering and Management, KICEM, 18(6), 47-56.
Bae, B. Y., Kim, K. R., Shin, D. W., Cha, H. S. (2017). "Improvement of Calculating Method of the Officially Assessed Individual House Price of Aged Apartment Remodeling Reflecting Feasibility Analysis" Korean Journal of Construction Engineering and Management, KICEM, 18(6), 89-97.
Lee, H. K., Kim, K. R., Kim, Y. J., Shin, D. W., Cha, H. S. (2017). "Risk Assessment Model for the Delay Protocol in the Conditions of Contract of International Construction Projects" Korean Journal of Construction Engineering and Management, KICEM, 18(6), 65-77.
Cha, H. S., Kim, K. R., Yoo, J. H., Shin, D. W. (2016). "A methodology for Predicting Equity Input Timing/Amount for Decision Making of Financing Apartment Housing Projects - From the Perspective of Mid-sized Construction Companies -" Korean Journal of Construction Engineering and Management, KICEM, 17(2), 21-30.
Kim, K. R., Nam, S. H. (2016). "Development of Project Delivery System in Public Sector for Modular Building" Korean Journal of Construction Engineering and Management, KICEM, 17(4), 49-56.
Kim, K. R., Yoon, Y. H., Kim, C. H. (2016). "Improvements in the Business Process Model for the Aged Apartment Remodeling Project - In Case of the Number of Units Increased -" Korean Journal of Construction Engineering and Management, KICEM, 17(5), 45-53.
Cha, H. S., Lee, D. G., Shin, D. W., Kim, K. R. (2015). "Development of BIM-based Construction Document Information Database Structure through the Link to the BIM Model and Construction Document Information" Korean Journal of Construction Engineering and Management, KICEM, 16(5), 42-53.
Kim, K. R., Yoon, J. S., Shin, D. W., Cha, H. S. (2015). "A Business Model for Application of the Modular Building in the Rental Market" Korean Journal of Construction Engineering and Management, KICEM, 16(6), 3-11.
Kim, K. R., Kim, H. C., Shin, D. W., Cha, H. S. (2015). "Application Effect Analysis of The Modular Construction Method in The Extension Works" Korean Journal of Construction Engineering and Management, KICEM, 16(6), 101-111.
Kim, K. R., Kim, H. C., Hwang, Y. K (2014). "Study on the Application of Multi-skilled labors to Factory Production Process for Securing Economic Feasibility of Modular Unit" Korean Journal of Construction Engineering and Management, KICEM, 15(1), 11-19.
Kim, K. R., Kim, K. H., Park, W. S., Lee, E. J, Hwang, Y. K (2014). "A Model for Predicting Management Costs of the Multiple Prime Contract" Korean Journal of Construction Engineering and Management, KICEM, 15(2), 44-52.
Shin, D. W., Kim, K. R., Cha, H. S., Cha, N. W., Park, W. S. (2014). "Construction Waste Management System for Improving Waste Treatment on the Construction Site" Korean Journal of Construction Engineering and Management, KICEM, 15(3), 83-91.
Shin, D. W., Kim, K. R., Cha, H. S., Cho, Y, S., Hwang, Y. K (2014). "Developing Countermeasure Model to Prevent Planned Lawsuit on Apartment Construction Defects" Korean Journal of Construction Engineering and Management, KICEM, 15(3), 74-82.
Cha, H. S., Woo, J. P., Kim, K. R., Shin, D. W. (2013). "A Study on Duration Calculation Method for Eco-Friendly Remodeling Demolition Work Using Productivity Analysis" Korean Journal of Construction Engineering and Management, KICEM, 124-132.
Cha, H. S., Kim, K. R., Shin, D. W., Seo, H. D. (2013). "BIM-Based LCC Analysis Process for Exterior Skin System of Buildings" Journal of the Architectural Institute of Korea Structure & Construction, 29(2), 47-58.
Cha, H. S., Kim, W. H., Shin, D. W., Kim, K. R. (2013). "Profit/Cost Prediction Model for Economic Feasibility Assessment on Aged-Housing Remodeling Projects" Journal of the Architectural Institute of Korea Structure & Construction, 29(4), 85-92.
Kim, K. R., Cha, H. S., Kim, D. S., Shin, D. W. (2013). "A Study on the Strategy for Creating Demand of Modular Construction through Case Analysis by Building Type" Korean Journal of Construction Engineering and Management, KICEM, 14(5), 164-174.
Cha, H. S., Kim, K. R., Ko, Y. J., Shin, D. W. (2012). "Selecting Optimum Management Practices according to Project Characteristics for Improving Project Performance" Korean Journal of Construction Engineering and Management, KICEM, 13(1), 3-13.
Kim, K. R., Chae, S. H., Shin, D. W., Cha, H. S. (2012). "A Model for Evaluating Eco-friendly Demolition Works for Remodeling in the Pre-construction Stage" Korean Journal of Construction Engineering and Management, KICEM, 13(1), 14-23.
Kim, K. R., Bae, B. Y., Cha, H. S., Shin, D. W. (2012). "To Improve Production Process of the Modular Using the Conveyor System" Korean Journal of Construction Engineering and Management, KICEM, 13(5), 103-112.
Cha, H. S., Woo, J. P., Kim, K. H., Hwang, Y. K, Kim, K. R. (2011). "Development of Optimal TACT Process for Eco-Friendly Demolition Works in Aged Housing Remodeling - Focus on Case Study -" Korean Journal of Construction Engineering and Management, KICEM, 3-12.
Cha, H. S., Kim, Y. D., Kim, K. R., Shin, D. W. (2011). "Evaluation Method of Green Construction Technologies Using Integrated LCC and LCA Analysis" Korean Journal of Construction Engineering and Management, KICEM, 91-100.
Cha, H. S., Choi, S. W., Shin, D. W., Kim, K. R. (2011). "A Study on Analyzing Success Factors of Project Financing Within Small and Middle Scale Development Project" Korean Journal of Construction Engineering and Management, KICEM, 21-28.
Kwak, J. Y., Cha, H. S., Shin, D. W., Kim, K. R. (2011). "Developing a Time-Cost Estimation Model for Evaluating Construction Alternatives of Structural Works in Housing" Journal of the Architectural Institute of Korea Structure & Construction, 27(7), 195-202.
Kim, J. H., Kim, K. R., Han, J. Y. (2011). "An Administration Model for Causes of Delay in Construction Projects to Decide Time Extension Responsibility" Korean Journal of Construction Engineering and Management, KICEM, 12(6), 31-41.
Kim, K. R., Lee, K. B., Shin, D. W., Cha, H. S. (2011). "A Proposal for Optimizing Unit Modular System Process to Improve Efficiency in Off-site Manufacture, Transportation and On-site Installation" Korean Journal of Construction Engineering and Management, KICEM, 12(6), 14-21.
Cha, H. S., Shin, D. W., Kim, Y. D., Kim, K. R., Kim, K. H. (2010). "Economic Evaluation of Eco-friendly Demolition Work and Case study in Remodeling Project" Korean Journal of Construction Engineering and Management, KICEM, 11(2), 45-53.
Cha, H. S., Chae, S. H., Kim, K. R., Kim, K. H., Han, J. Y. (2010). "Constructability Analysis in Aged-Housing Remodeling Demolition Work for Maximizing Waste Recycling" Korean Journal of Construction Engineering and Management, KICEM, 11(3), 13-22.
Kim, Y. J., Kim, K. R. (2010). "Improvements on the Total Project Cost Management System for SOC Projects" Korean Journal of Construction Engineering and Management, KICEM, 11(3), 105-114.
Kim, K. R., Yu, I. H. (2008). "Development of an Operation Model for Technical Proposal-Based Tender of Public Construction Projects" Korean Journal of Construction Engineering and Management, KICEM, 9(2), 136-145.
Kim, K. R., Shin, D. W., Kim, E. J. (2008). "Improvement for Safety Education Considering Individual Personality in the Construction Site" Korean Journal of Construction Engineering and Management, KICEM, 9(3), 175-184.
Kim, K. R., Yu, I. H. (2008). "A Selection Model of Suitable Tendering System for Public Construction Projects" Korean Journal of Construction Engineering and Management, KICEM, 9(3), 164-174.
Kim, K. R., Kim, K. H., Hwang, Y. K (2008). "Selection Method of Eco-friendly Finishing Materials Considering Cost Efficiency for the Aged Housing Remodeling Projects" Korean Journal of Construction Engineering and Management, KICEM, 9(4), 84-91.
Kim, K. R., Shin, D. W., Kim, E. J. (2008). "A Model for Safety Education Fit for Individual Personality of Construction Worker" Korean Journal of Construction Engineering and Management, KICEM, 9(5), 116-126.
Kim, K. R., Kang, S. Y., Hwang, Y. K (2008). "A Scheduling Method Of Dismantling Work Considering Specific Condition Of Remodeling Project - Focused on Old Aged Apartment House with Wall-Slab Structure -" Korean Journal of Construction Engineering and Management, KICEM, 9(5), 104-115.
Kim, K. R., Han, J. Y., Kim, K. H., Hwang, Y. K (2008). "A Process Model of Eco-friendly Demolition Work for Wall Type Aged Housing Remodeling" Korean Journal of Construction Engineering and Management, KICEM, 9(6), 204-215.
Kim, K. R., Kim, J. H. (2007). "Analysis of Delay Causation by Characteristics of Construction Projects" Korean Journal of Construction Engineering and Management, KICEM, 8(1), 78-86.
Shim, H. B., Kim, K. R., Kim, Y. S., Jung, Y. S., Chin, S. Y., Yoon, S. W. (2007). "An Analysis on Correlation Relationship between Informatization and Business Performance of Architecture and Engineering Firms" Korean Journal of Construction Engineering and Management, KICEM, 8(1), 159-168.
Kim, K. R., Shin, D. W., Kim, K. H., Lee, K. S. (2007). "Profitability Influence Factor Analysis by Apartment Remodeling Case Study" Korean Journal of Construction Engineering and Management, KICEM, 8(2), 127-135.
Kim, K. R., Kim, K. H. (2007). "Analysis and Suggestion of Environment-friendly Interior Finishing Materials for Aged Apartment Remodeling" Korean Journal of Construction Engineering and Management, KICEM, 8(2), 118-126.
Kim, K. R., Kim, J. H. (2007). "An Administration Model for Causation of the Schedule Delays in Construction Projects" Korean Journal of Construction Engineering and Management, KICEM, 8(3), 125-133.
Kim, K. R., Shin, D. W., Han, J. Y., Han, I. T., Chun, J. Y. (2006). "A Analysis of the Weight for the Required Performance Items of Building Elements in the Apartment Housing" Korean Journal of Construction Engineering and Management, KICEM, 7(2), 81-88.
Park, M. S., Kim, K. R., Shin, D. W., Cha, H. S. (2006). "Improvement on TACT Scheduling Method Applying Theory of Constraints" Journal of the Architectural Institute of Korea Structure & Construction, 22(6), 139-146.
Hong, S. S., Kim, K. R., Shin, D. W., Cha, H. S. (2006). "Development of Web-Based Performance Measurement System for Construction Companies" Journal of the Architectural Institute of Korea Structure & Construction, 22(7), 107-114.
Lee, K. H., Kim, K. R., Shin, D. W. (2006). "Improvement of Non-Working Day Estimation Affected by Weather Conditions in the Construction Projects in Korea" Korean Journal of Construction Engineering and Management, KICEM, 7(4), 100-108.
Yu, I. H., Kim, K. R., Jung, Y. S., Chin, S. Y. (2006). "Analysis of Quantified Characteristics of the Performance Indicators for Construction Companies" Korean Journal of Construction Engineering and Management, KICEM, 7(4), 154-163.
Kim, K. R., Yu, I. H., Jung, Y. S., Chin, S. Y. (2005). "Key Performance Indicators for Developing Construction Performance Index" Journal of the Architectural Institute of Korea Structure & Construction, 21(2), 139-150.
Kim, K. R., Shin, D. W., Kim, K. H., Yu, I. H. (2005). "Evaluation of Performance Measurement System Alternatives for the Construction Companies" Journal of the Architectural Institute of Korea Structure & Construction, 21(6), 97-104.
Kim, K. R., Shin, D. W., Lee, W. C. (2005). "Key Performance Indicator of ISO Quality Management System in the Construction Industry" Journal of the Architectural Institute of Korea Structure & Construction, 21(7), 123-130.
Kim, K. R., Shin, D. W., Yu, I. H., Jung, W. J. (2005). "Analysis of the Weights of Performance Measurement Index according to the Size of Construction Companies" Journal of the Architectural Institute of Korea Structure & Construction, 21(8), 121-128.
Kim, K. R., Shin, D. W., Jung, S. L., Han, J. Y. (2004). "Material Planning Model for Multi-Project Management in Medium-sized Construction Companies" Korean Journal of Construction Engineering and Management, KICEM, 5(2), 106-114.
Kim, K. R., Lee, H. S., Son, B. S., Son, C. S. (2004). "Manpower Extimating Model for Military Facility Management Using Indices" Journal of the Architectural Institute of Korea Structure & Construction, 20(5), 111-119.
Kim, K. R., Shin, D. W., Hong, J. S., Kim, Y. J. (2004). "An Analysis Method for the Concurrent Delay Using Delay Section Concept" Journal of the Architectural Institute of Korea Structure & Construction, 20(6), 141-148.
Kim, K. R., Shin, D. W., Lee, G. C. (2004). "Total Float Distribution Using the Linear Programming" Journal of the Architectural Institute of Korea Structure & Construction, 20(9), 159-166.
Kim, K. R., Yu, I. H., Kim, Y. S., Jung, Y. S., Chin, S. Y. (2004). "A Framework of the Comparable Performance Measurement in the Construction Industry" Korean Journal of Construction Engineering and Management, KICEM, 5(5), 172-182.
Kim, K. R., Shin, D. W., Han, J. Y., Hong, Y. S. (2004). "A Resource Model for Multi-project Management" Journal of the Architectural Institute of Korea Structure & Construction, 20(11), 133-142.
Kim, K. R., Shin, D. W., Lee, W. C., Hong, J. S., Kim, Y. J. (2004). "A Case Study on Delay Analysis Methods in the Construction Projects" Korean Journal of Construction Engineering and Management, KICEM, 5(6), 129-137.
Kim, K. R., Shin, D. W., Kim, Y. J., Han, J. Y., Kim, C. D., Seo, S. W. (2003). "A Tact Planning and Scheduling Process Model for Reduction of Finishing Work Duration in Building Construction Projects" Journal of the Architectural Institute of Korea Structure & Construction, 19(1), 161-168.
Kim, K. R., Kim, J. J., Lee, Y. S., Ryou, W. S., Pyun, H. J. (2003). "Improvements for CM service and practice through analyzing domestic CM cases" Journal of the Architectural Institute of Korea Structure & Construction, 19(1), 153-160.
Kim, K. R., Shin, D. W., Choi, K. H., Han, J. Y. (2003). "An Effective Multiple Project Scheduling for the Small and Medium sized Construction Companies" Journal of the Architectural Institute of Korea Structure & Construction, 19(4), 177-184.
Shin, D. W., Kim, K. R., Kim, H. R., Yu, I. H. (2003). "An Influence Analysis of the Reduction of Working Time in Construction Sites" Journal of the Architectural Institute of Korea Structure & Construction, 19(4), 161-168.
Kim, K. R., Shin, D. W., Yang, S. Y. (2003). "A Brand Marketing Strategy for A Construction Company to Extend its Market to the Apartment Construction" Journal of the Architectural Institute of Korea Structure & Construction, 19(6), 169-176.
Kim, K. R., Shin, D. W., Kim, Y. J., Park, S. K. (2003). "Working Design Management of the Design Build Projects Using Case-Based Reasoning" Journal of the Architectural Institute of Korea Structure & Construction, 19(7), 147-154.
Kim, K. R., Shin, D. W., Kim, Y. J. (2003). "An Analysis Model for Schedule Delay Claims in Construction Projects Using Delay Section Concept" Journal of the Architectural Institute of Korea Structure & Construction, 19(17), 187-194.
Kim, K. R., Shin, D. W., Kim, Y. D. (2003). "A Study on the Apartment Marketing Strategy of Medium-sized Building Construction Firm by Market Segmentation" Journal of the Architectural Institute of Korea Structure & Construction, 19(8), 137-144.
Kim, K. R., Shin, D. W., Kim, Y. J., Lee, H. K., Park, C. S. (2003). "Design Development Management in the Design-Build Project by Case-Study" Korean Journal of Construction Engineering and Management, KICEM, 4(3), 128-136.
Shin, D. W., Kim, K. R., Kim, C. D., Seo, S. W., Hwang, H. S. (2002). "Analysis of Actual Duration by Effecting Elements to Duration Estimate - Focused on Standard Duration of the Office Building Construction -" Korean Journal of Construction Engineering and Management, KICEM, 3(3), 84-93.
▶ Professor. Hee-sung Cha
Jang Myung-Houn ,Cha Hee-Sung, (2005) “A Method of Resource Leveling by Scheduling Resource Delivery and Use”, Journal of the Architectural Institute of Korea Structure & Construction, Vol.21 No.7, 83-90
Kim, Jun ,Cha, Heesung, (2018) “A Framework on 3D Object-Based Construction Information Management System for Work Productivity Analysis for Reinforced Concrete Work”,KICEM, Vol.19 No.2, 15-24
Yoon, Jonghan ,Cha, Heesung, (2018) “Development of Optimal Facility Management (FM) Process Using Spatial-data-based Mean Time Between Failure (MTBF) Analysis”,KICEM, Vol.19 No.3, 43-51
Yoon, Jongsik ,Shin, Dongwoo ,Cha, Heesung ,Kim, Kyungrai, (2017) “A Study on Improvement of Modular Specifications - Focused on technical specifying method in waterproof and mechanical works –“, KICEM, Vol.18 No.3, 33-41
Bae, Byungyun ,Kim, Kyungrai ,Shin, Dongwoo ,Cha, Heesung, (2017) “Analysis Methodology for Feasibility Study of Remodeling of Aged Apartment by Comparative Analysis of Price Influencing Factors”, KICEM, Vol.18 No.6, 47-56
Lee, Hwangku ,Shin, Dongwoo ,Kim, Kyungrai ,Cha, Heesung ,Kim, Youngjae, (2017) “Risk Assessment Model for the Delay Protocol in the Conditions of Contract of International Construction Project”, KICEM, Vol.18 No.6, 65-77
Bae, Byungyun ,Kim, Kyungrai ,Shin, Dongwoo ,Cha, Heesung, (2017) “Improvement of Calculating Method of the Officially Assessed Individual House Price of Aged Apartment Remodeling Reflecting Feasibility Analysis”, KICEM, Vol.18 No.6, 89-97
Lee, Dong-gun ,Cha, Heesung, (2016) “A Probabilistic Risk-based Cost Estimation Model for Initial-Stage Decision Making on Apartment Remolding Projects”, KICEM, Vol.17 No.2, 70-79
Yoo, Jinhyuk ,Cha, Heesung ,Shin, Dongwoo ,Kim, Kyungrai, (2016) “A methodology for Predicting Equity Input Timing/Amount for Decision Making of Financing Apartment Housing Projects - From the Perspective of Mid-sized Construction Companies –“, KICEM, Vol.17 No.2, 21-30
Yoon, Jongsik ,Shin, Dongwoo ,Cha, Heesung ,Kim, Kyungrai, (2015)” A Business Model for Application of the Modular Building in the Rental Market”, KICEM, Vol.16 No.6, 3-11
Kim, Hakcheol ,Shin, Dongwoo ,Cha, Heesung ,Kim, Kyungrai, (2015) “Application Effect Analysis of The Modular Construction Method in The Extension Works”, KICEM, Vol.16 No.6, 101-111
Lee, Donggun ,Cha, Heesung ,Kim, Kyungrai ,Shin, Dongwoo , (2015) ” Development of BIM-based Construction Document Information Database Structure through the Link to the BIM Model and Construction Document Information”, KICEM, Vol.16 No.5 ,32-53
Lee, Dong-Gun ,Cha, Hee-Sung, (2014) “Predicting Project Performance by Analyzing Key Success Factors on Project Fiancing(PF) Development”, KICEM, Vol.15 No.5, 127-137
Cho, Youngsun ,Cha, Heesung ,Kim, Kyungrai ,Hwang, Youngkyu ,Shin, Dongwoo , (2014) “Developing Countermeasure Model to Prevent Planned Lawsuit on Apartment Construction Defects”, KICEM, Vol.15 No.3,74-82
Cha, Namwoo ,Park, Wansu ,Kim, Kyungrai ,Cha, Heesung ,Shin, Dongwoo, (2014) “Construction Waste Management System for Improving Waste Treatment on the Construction Site”, KICEM, Vol.15 No.3, 83-91
Cha, Hee-Sung ,Kim, Ki-Hyun, (2013) “Development of Construction Project Performance Management System(PPMS) Considering Project Characteristics”, KICEM, Vol.14 No.1, 82-90
Lee, Dong-Gun ,Cha, Hee-Sung, (2013) “An Exploratory Research on Quantitative Risk Assessment Methodology Throughout Success Factor Analysis in Project Financing” , KICEM, Vol.14 No.5, 92-102
Kim, Dong-Soo ,Kim, Kyung-Rai ,Cha, Hee-Sung ,Shin, Dong-Woo, (2013) “A Study on the Strategy for Creating Demand of Modular Construction through Case Analysis by Building Type”, KICEM, Vol.14 No.5, 164-174
Seo, Hae-Doo ,Kim, Kyung-Rai) ,Shin, Dong-Woo, Cha, Hee-Sung, (2013) “BIM-Based LCC Analysis Process for Exterior Skin System of Buildings”, Journal of the Architectural Institute of Korea Structure & Construction, Vol.29 No.2, 47-58
Kim, Wan-Hyuk, Cha, Hee-Sung, Shin, Dong-Woo ,Kim, Kyung-Rai, (2013) ” Profit/Cost Prediction Model for Economic Feasibility Assessment on Aged-Housing Remodeling Projects”, Journal of the Architectural Institute of Korea Structure & Construction, Vol.29 No.4, 85-92
Woo, Joong-Pyung ,Cha, Hee-Sung ,Kim, Kyung-Rai ,Shin, Dong-Woo, (2013) “A Study on Duration Calculation Method for Eco-Friendly Remodeling Demolition Work Using Productivity Analysis”, KICEM, Vol.14 No.1, 124-132
Cha, Hee-Sung ,Kim, Ki-Hyun, (2013)” Development of Construction Project Performance Management System(PPMS) Considering Project Characteristics”, KICEM, Vol.14 No.1, 82-90
Bae, Byung-Yoon ,Kim, Kyung-Rai ,Cha, Hee-Sung ,Shin, Dong-Woo, (2012) “To Improve Production Process of the Modular Using the Conveyor System”, KICEM, Vol.13 No.5, 103-112
Ko, Young-Jin ,Cha, Hee-Sung ,Shin, Dong-Woo ,Kim, Kyung-Rai, (2012) “Selecting Optimum Management Practices according to Project Characteristics for Improving Project Performance”, KICEM, Vol.13 No.1, 3-13
Chae, Seong-Hyun ,Kim, Kyung-Rai ,Shin, Dong-Woo ,Cha, Hee-Sung, (2012) “A Model for Evaluating Eco-friendly Demolition Works for Remodeling in the Pre-construction Stage”, KICEM, Vol.13 No.1, 14-23
Lee, Kwang-Bok ,Kim, Kyung-Rai ,Shin, Dong-Woo ,Cha, Hee-Sung, (2011) “A Proposal for Optimizing Unit Modular System Process to Improve Efficiency in Off-site Manufacture, Transportation and On-site Installation”, KICEM, Vol.12 No.6, 14-21
Ko, Young-Jin ,Cha, Hee-Sung, (2011) “A Development of Project Performance Predicting System(PPS) considering Construction Project Characteristics”, KICEM, Vol.12 No.1, 62-72
Woo, Joong-Pyung ,Kim, Ki-Hyun ,Hwang, Young-Gyu ,Kim, Kyung-Rai ,Cha, Hee-Sung, (2011) “Development of Optimal TACT Process for Eco-Friendly Demolition Works in Aged Housing Remodeling - Focus on Case Study –“, KICEM, Vol.12 No.1, 3-12
Kim, Yoon-Duk ,Cha, Hee-Sung ,Kim, Kyung-Ra ,Shin, Dong-Woo, (2011) “Evaluation Method of Green Construction Technologies Using Integrated LCC and LCA Analysis”, KICEM, Vol.12 No.3, 91-100
Choi, Si-Woong ,Cha, Hee-Sung ,Kim, Kyung-Rai ,Shin, Dong-Woo, (2011) “A Study on Analyzing Success Factors of Project Financing Within Small and Middle Scale Development Project”, KICEM, Vol.12 No.4, 21-28
Kwak Jin-Yeol, Kim Kyung-Rai, Shin Dong-Woo, Cha Hee-Sung, (2011) Developing a Time-Cost Estimation Model for Evaluating Construction Alternatives of Structural Works in Housing”, Journal of the Architectural Institute of Korea Structure & Construction, Vol.27 No.7, 195-202
Cho, Young-Seon ,Cha, Hee-Sung, (2010) “A Study of Project Characteristics and Project Performance Level of difficulty”, KICEM, Vol.11 No.6, 78-88
Cho, Bong-Ho ,Lee, Jae-Sung ,Cha, Hee-Sung, (2010) “Development of a Modular Building System for the BOQ Using Six-sigma”, KICEM, Vol.11 No.6, 89-99
Cho Bong-Ho, Kim Hong-Jin) , Lee Seung-Joon, Cha Hee-Sung, (2010) ” Design Methodology of Structural Beam for Modular Buildings Using Six-sigma”, KICEM, Vol.26 No.11, 75-85
Lee, Dong-Gun ,Cha, Hee-Sung, (2010) “Development of BIM Standard Database System for an Approximate Estimate of Old-Aged Apartment Remodeling Project”, Vol.11 No.5, 53-64
Chae, Seong-Hyun ,Kim, Ki-Hyun ,Cha, Hee-Sung ,Kim, Kyung-Rai ,Han, Ju-Yeoun, (2010) “Constructability Analysis in Aged-Housing Remodeling Demolition Work for Maximizing Waste Recycling”, Vol.11 No.3, 13-22
Kim, Yoon-Duk ,Kim, Ki-Hyun ,Cha, Hee-Sung ,Kim, Kyung-Rai ,Shin, Dong-Woo, (2010) “Economic Evaluation of Eco-friendly Demolition Work and Case study in Remodeling Project”, KICEM, Vol.11 No.2, 45-53
Han, Ju-Yeoun ,Cha, Hee-Sung ,Lee, Dong-Gun, (2009) ”A Measure for Standardization of Old Aged Apartment Remodeling through Application of BIM”, KICEM, Vol.4 No.2, 53-61
Shin, Kang-Yong ,Cha, Hee-Sung, (2008) “Risk-Based Performance Evaluation and Prediction Tool by Characterizing Construction Projects in Pre-Project Planning”, KICEM, Vol.9 No.5, 168-175
Cha, Hee-Sung, Kim, Tae-kyung, (2008) “Developing Measurement System for Key Performance Indicators on Building Construction Projects”, KICEM, Vol.9 No.4, 120-130
Kim, Jee-Hye ,Shin, Dong-Woo ,Cha, Hee-Sung, (2007) “Development of the Construction Waste Management Performance Evaluation Tool (WMPET): Quantification of Waste Management Performance Factors and Establishment of Waste Management Performance Evaluation Tool”, KICEM, Vol.8 No.4, 128-136
Park Min-Seon, Kim Kyung-Rai, Shin Dong-Woo ,Cha Hee-Sung, (2006) ”Improvement on TACT Scheduling Method Applying Theory of Constraints” , Journal of the Architectural Institute of Korea Structure & Construction, Vol.22 No.6, 139-146
Hong Sung-Sei ,Kim Kyung-Rai, Shin Dong-Woo, Cha Hee-Sung, (2006) “Development of Web-Based Performance Measurement System for Construction Companies”, Journal of the Architectural Institute of Korea Structure & Construction, Vol.22 No.7, 107-114
Cha, Hee-Sung ,Shin, Dong-Woo ,Kim, Jee-Hye, (2006) “Patterns and Factors Causing Construction Waste Generation in High-Rise Housing Projects in Korea : A Case Study”, KICEM, Vol.7 No.3, 159-168
▶ Professor. Byung-joo Choi
Kim, T., Park, S., Choi, B., Kang, Y., Park, K., Jeong W., and Koo C. (2022) "A Survey of Perception Differences Among University Students, Professors, and Practitioners on the Construction Technologies in the Fourth Industrial Revolution" . Korean Journal of Construction Engineering and Management. Vol. 23, No. 3, pp. 095-103
Choi, B., Lee, H.S., Park, M., Kim, H., and Hwang, S. (2014) “4D BIM Based Workspace Planning Process in Building Construction Project.” Korean Journal of Construction Engineering and Management, Vol. 14, No. 5, pp. 175- 187, 2013 (in Korean)